Construction in Library Parking Lot
Heads up! 🚧 A portion of the Library parking lot near Rock Street and 9th Street will be closed from 7 a.m. to 5 p.m., July 10-19.
👷 Closure is for installing underground electrical conduit and sidewalks
🚧 Roads to remain open to thru traffic
💲 Cost: $2.8 million funded by the 2015 City Transportation Bonds